High temperature chamber: (1)Max preheating temperature: +200℃
(2)Heating time:RT→+200℃≤25min
Remark:The heating time is the performance of the high temperature chamber when it is running alone.
Low temperature chamber:(1)Min precooling temperature:-55℃
(2)Cooling time:RT→-55℃≤60min
Remark:The cooling time is the performance of the low temperature chamber when it is running alone.
Test Zone:(1)High temperature shock range:+60℃~+180℃
(2)Low temperature shock range:-40℃~0℃
Temperature fluctuation:≤±0.5℃
Temperature uniformity:≤±2.0℃
Temperature deviation:±2.0℃(≤+150℃),±3.0℃(>+150℃)
Shock recovery time:within ≤5min
Temperature conversion time:within 3s
Internal volume:80L-150L-225L-408L-800L-1000L-1500L(Customizable)
High low temperature(Three Zone)Thermal shock chamber is consist of High temperature test area(Pre-heating area), Low temperature test area(Pre-cooling)area and test area(RT), adopt independent wind path switching mode to transfer hot and cold air to test area make sure the high low temperature swift, the test sample shall not move during the test. The test chaber is suitable for the examination of the whole set of products, components, parts and materials subjected to rapid changes in temperature. The temperature impact test chamber are used in a shortest time to evaluate the test samples due to thermal expansion and contraction caused by the changes of chemical or physical damage. materials industry .
1.Three-zone Thermal Shock Chamber Modern design, latest modular creation technology ,perfect control power.
2.The Thermal Shock Test Chamber will automatically defroste after it cycle for 700H or more
3.Patent design initiative observation window to achieve visual effects
4.Color screen 32 control system Ethernet E management, USB data access, APP mobile platform management
5.Programmable load power 4 ON/OFF output control, to protect the products safety
6.Unique air circulation system
7.Unique anti condensation function and over temperature, breezeless, smoke protection function
8.Can expand the network video monitoring function, and data test synchronization
9.The most environmentally friendly refrigeration capacity control, energy saving and fast rising/cooling temperature rate
10. Auto return to room temperature setting
11.Diagnostic system for information on operating times and possible failures.
12.The device can expand the remote service function and provide the machine using a mathematical disc
1.Standard equipment
Test product load power supply 3 groups
Each side of the left and right side has a 50mm Pin hole
Pin hole silicone plug 2 PCS
Stainless steel sample holder 2 PCS
Compressed air drying filter
Isolated transducer, Protection device for testing product ( Sample protection to meet the standards NE60519-2.1993)
100mm diameter Pin hole
Nitrogen auxiliary device
Spare parts package
E management and Networking software
Video monitoring system
APP mobile platform management
Model |
ZHS-50-3P-A |
ZHS-80-3P-A |
ZHS-150-3P-A |
ZHS-225-3P-A |
ZHS-300-3P-A |
|
Internal volume |
49L |
80L |
150L |
225L |
300L |
|
Interior size(W*D*H mm) |
350*350*400 |
400*400*500 |
500*500*600 |
750*500*600 |
800*750*500 |
|
Outer size(W*D*H mm) |
Based on actual size |
|||||
Shock temperature |
Low temperature impact range |
-10℃~-40℃ |
-10℃~-55℃ |
-10℃~-65℃ |
-10℃~-55℃ |
-10℃~-65℃ |
High temperature impact range |
+60℃~+150℃ ; +60℃~+180℃ |
|||||
Heating rate of preheating zone |
3℃/min |
|||||
Cooling rate of precooling zone |
1℃/min |
|||||
Temperature range of precooling zone |
-10℃~-60℃ |
-10℃~-70℃ |
-10℃~-80℃ |
-10℃~-70℃ |
-10℃~-80℃ |
|
Preheating temperature range |
60℃~+200℃ |
|||||
Residence time |
30min |
|||||
Recovery time |
5min recovery |
|||||
Temperature fluctuation |
≤±0.5℃ |
|||||
Temperature resolution |
0.1℃ |
|||||
Conversion time |
≤5s |
|||||
Cooling method |
Water cooled/air cooled |
|||||
Reference standards |
JESD22-A106B ; GJB-150-A ; MIL-STD-810G ; MIL-STD-202G |
1.Technical consultation: test method, laboratory planning and suggestion.
2.Equipment selection: selection scheme, FAQ.
3.Product testing scheme.
A1:If your product requires environmental testing, please contact us to get testing solution and quotation. We will respond to your request within
12 hours.
Q2:How to contact us?
A2:1.Phone: +886 976 590 796
2. E-mail: sales@zh-talents.com
Q3:How to place an order?
A3:If all the details of the products are confirmed,we can draft a contact to you.Also you can send the PO to us by mail.
Q4:How to deal with equipment problems and how to guarantee after-sales service?
A4:If there is problem with the equipment, please contact us and we will reply within 12 hours and arrive at your site within 48 hours.
We have after-sales service offices in Southeast Asia, Taiwan, Hong Kong and other places, and cooperative service providers in other regions.
Q5:How is the product packaged and shipped through logistics?
A5:1. Use export standard wooden boxes for packaging.
2. Choose the most favorable transportation method. Sea freight, air freight, railway, truck transportation, and multimodal transportation.
3. Fast delivery, some models are in stock and will be shipped in 1-3 days.